SHOP 01
FRAME & CONVEYOR ASSEMBLY
Frame, conveyor and filling heads assembled and aligned on jigs before wiring starts.
Documents you can check before ordering, and photos of how the machine is packed and shipped after it is built.
The machine is assembled, wired and run on our own production floor before it is packed. These are workshop photos of the same floor the test videos are filmed on.
SHOP 01
Frame, conveyor and filling heads assembled and aligned on jigs before wiring starts.
SHOP 02
The complete line is built up and run as one unit, then broken down for packing and shipping.
SHOP 03
Hoses, sensors and the control cabinet wired and labelled against the wiring diagram.
SHOP 04
Every unit runs on real bottles and your own product sample before it is released.
Photos are taken on our own floor. Ask for a fresh photo or a live video call of your machine being built and tested at any stage.
Issued per machine or applied per model. Tell us which certificates your buyer or customs requires and we confirm each one before you order.
CERT 01
CE conformity declaration for the delivered configuration.
CERT 02
Quality management system certificate of the manufacturing plant.
CERT 03
Third-party test report on accuracy and material, on request.
CERT 04
Structure and appearance patents of the machine series.
CERT 05
Material certificate for wetted parts — typically SUS304.
CERT 06
Pre-shipment inspection report with function and leak test photos.
Certificate names and issuing bodies vary by market and product. We only list what we can actually issue for your machine.
Fumigation-free plywood case, moisture barrier, reinforced base and spare parts boxed separately. Photos are taken at every step and sent to you before shipment.
PHOTO 01
Export plywood case, no fumigation needed for most destinations.
PHOTO 02
Machine wrapped in stretch film over a moisture barrier before the case is closed.
PHOTO 03
Machine bolted down to the crate base on timber blocks, so it cannot shift in transit.
PHOTO 04
Crate loaded and braced inside the container — photos sent before the doors close.
PHOTO 05
Spare parts, tools and seals boxed and labelled separately.
PHOTO 06
Shipping marks, case labels and the packing list matching what is inside the case.
Loading photos and the packing list are sent before the container leaves. Customs documents follow the same list, so nothing is missing on arrival.
Function and leak test on the finished machine, with photos.
Case, wrapping, base and spare parts photographed before closing.
Loading photos, packing list, invoice and shipping documents.
Remote or on-site installation guidance, plus operator training material.
Send your material and container requirements and request a real machine test video for your product.